May 2
Bid ended
23032 UM SOC Early Learning and Evaluation Center (ELEC) #17910
(T-NR) The project is two stories with a total of approximately 51,500 sf of new construction, of which +/-14,900 sf is shell space on the second floor.
FOR REFERENCE ONLY
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| SOC ELEC Demolition Package Drawings | 15.1 MB | |||
| SOC ELEC Demolition Package Specifiications | 11.6 MB |
Plans
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| UM SOC ELEC 100% CD Set_031325 | 158.2 MB |
