21063.00 UM South Campus Recreation Facility & Transportation Hub New Field Lighting #12359
Status
Bidding Closed
Prebid Date | 11/17/22 10:00am |
Bid Date | 12/8/22 2:00pm |
Company & Contacts
Notice is hereby given that sealed bids for:
THE UNIVERSITY OF MISSISSIPPI
SOUTH CAMPUS RECREATION FACILITY
& TRANSPORTATION HUB NEW FIELD LIGHTING
UM # 21-011
BID FILE # 1071
Bids will be received by The University of Mississippi, Office of the Director of Procurement Services,
164_Jeanette Phillips Drive, P.O. Box 1848, University, MS 38677, until 2:30 PM (CST) on Thursday,
December 01, 2022, per Bid File # 1071 and thereby publicly opened and read. For questions, please
contact:
JBHM Architects, P.A.
105 Court Street
Tupelo, MS 38804
(662) 844-1822
Attn: Brandon Bishop, AIA
Bid documents are being made available via digital and original paper copy. Plan holders are required
to register and order bid documents at http://www.universityofmsprojects.com/. Bid documents are
non-refundable and must be purchased through the website. All plan holders are required to have a
valid email address for registration. Questions regarding website registration and online orders
please contact Plan House Printing at (662) 407-0193.
A pre-bid conference will be held Thursday, November 17, 2022, at 10:00 a.m. in the Large Conference
Room of the John W. White Facilities Management Building, 700 Hathorn Road, University, MS. University
parking permits are required for all attendees. Information about the permits and a link to purchase them are
available at http://www.olemiss.edu/parking/visitors.html.
Bid preparation will be in accordance with Instructions to Bidders bound in the project manual. The University
of Mississippi reserves the right to waive irregularities and to reject any or all bids submitted.
Bids must be submitted on the form to be furnished by the architect and must be accompanied by bid bond or
certified check for at least five percent (5%) of the base bid payable to University of Mississippi, University,
Mississippi.
Bid envelope must contain on the outside of the envelope, the Contractor’s current Certificate of
Responsibility Number and the Contractor’s License Number unless a statement on the exterior says that the
bid enclosed is less than or did not exceed $50,000.00. Envelope containing bids must be sealed, marked
and addressed as follows:
THE UNIVERSITY OF MISSISSIPPI
SOUTH CAMPUS RECREATION FACILITY
& TRANSPORTATION HUB NEW FIELD LIGHTING
UM # 21-011
BID FILE # 1071
IHL #207-372 THE UNIVERSITY OF MISSISSIPPI UM# 21-011
SOUTH CAMPUS RECREATION FACILITY JBHM 21063.00
& TRANSPORTATION HUB NEW FIELD LIGHTING
10/21/2022 ADVERTISEMENT FOR BIDS (v. 010219) – 00 11 13 PAGE 2 of 2
BIDS MAY BE SUBMITTED ELECTRONICALLY BY FOLLOWING INSTRUCTIONS AT THIS LINK:
https://procurement.olemiss.edu/bid-file/
By: Rachel Bost
Director of Procurement Services
Dates of Publication: Sunday, October 30, 2022
Sunday , November 6, 2022