Apr 21
Bid ended

1028 Alumni Drive, Rebel Drive, and Dormitory Row North Paving Project #11232

University, MS (T-NR)

Status

Bidding Closed

Prebid Date 4/7/22 2:00pm
Bid Date 4/21/22 2:30pm

Company & Contacts

W.L. Burle Engineers, P.A.
Kyle Anderson  
(662) 236-6776

Notice is hereby given that The University of Mississippi Facilities Management department requests sealed bids for: THE UNIVERSITY OF MISSISSIPPI ALUMNI DRIVE, REBEL DRIVE, AND DORMITORY ROW NORTH PAVING PROJECT
BID FILE #1028.

Bids will be received by The University of Mississippi, Office of the Director of Procurement
Services, 164 Jeanette Phillips Drive, P.O. Box 1848, University, MS 38677 until 2:30 PM (CT) on
Thursday, April 21, 2022, per Bid File #1028 and thereby publicly opened and read.

For project specifications and drawings, please contact: W.L. Burle, Engineers, P.A. 100 Commerce Drive, Suite A Oxford, MS 38655 Attn: William Burle, Jr. P.E. Email: wlb@wlburle.com.

Plans, Specifications and Contract Documents are available in paper copy or digital copy upon receipt
of a $75.00 (non-refundable) deposit per set. Plan holders are required to log-in or register for an
account at www.wlburleplanroom.com to view and order Bid Documents. All plan holders are required to have a valid email address. Bid documents are nonrefundable and must be purchased through the
website. All questions regarding website registration, online orders, or electronic downloads please contact Plan House Printing of Tupelo, MS (Phone No. 662/407-0193). All other questions shall be addressed by contacting W.L. Burle Engineers, P.A., 100 Commerce Drive, Suite A, Oxford,
Mississippi 38655 (Fax No. 662/236-6263, Phone No. 662/236-6776, or Email kpa@wlburle.com).
A pre-bid conference will be held Wednesday, April 7, 2022, at 2:00 PM (CT). Due to social distancing requirements related to COVID-19, the public may only attend the pre-bid conference by Zoom. In order to attend, please send a request by email to Kyle Anderson (kpa@wlburle.com) no later than 5:00 pm CT the day before the scheduled pre-bid conference. An invitation to the Zoom prebid
conference will be sent back to you by email.
Site visits are available by appointment only. Contact Kyle Anderson (kpa@wlburle.com) to schedule a time.

Bid preparation will be in accordance with Instructions to Bidders bound in the project manual. The University of Mississippi reserves the right to waive irregularities and to reject any or all bids submitted.

Bids may be submitted electronically by following the instructions at this link: https://procurement.olemiss.edu/bid-file/.
Bids must be submitted on the form to be furnished by the architect and must be accompanied by bid
bond or certified check for at least five percent (5%) of the base bid payable to University of Mississippi, University, Mississippi. Bid envelope must contain on the outside of the envelope, the Contractor’s current Certificate of Responsibility Number and the Contractor’s License Number unless a statement on the exterior says that the bid enclosed is less than or did not exceed $50,000.00. Envelope containing bids must be
sealed, marked and addressed as follows:
ALUMNI DRIVE, REBEL DRIVE, AND DORMITORY ROW NORTH PAVING PROJECT THE UNIVERSITY OF MISSISSIPPI UNIVERSITY, MISSISSIPPI
THE UNIVERSITY OF MISSISSIPPI ALUMNI DRIVE, REBEL DRIVE, AND DORMITORY ROW NORTH PAVING PROJECT BID FILE #1028

BIDS MAY BE SUBMITTED ELECTRONICALLY BY FOLLOWING INSTRUCTIONS AT THIS LINK:
https://procurement.olemiss.edu/bid-file/

By: Rachel Bost
Director of Procurement Services

Dates of Publication:
March 20, 2022
March 27, 2022